Soft Playground Surface in Watford

40mm depth installation in Purple for Leavesden Green Primary School in Watford

  • Image

Leavesden Green Primary School in Waford required a suitable outdoor play area for the children adjacent to the classrooms. Kier excavated and prepared the area with Type 1 MOT Stone to form a suitable base foundation. We then arranged delivery of materials to site via Palletways. The next stage involved us laying the Rubber SBR base layer over the compacted MOT stone at a 25mm depth. We then installed the top wearing coat in Purple at 15mm to complete the project. A period of 24 hours is then allowed for the new surface to fully cure. During this period the area must be fenced off to prevent anyone gaining access and walking on it. Once this period has expired the safety surface is suitable for use.

Customer Testimonials

We instructed Safeplay to install a new Red Wet-Pour Safety Surface at Drake Primary School. They delivered a quality product within budget on time. Very happy with the finished surface.

Danny Branson Morgan Sindall Construction

We placed an order with Safeplay to install over 1000sqm of Black wet pour safety surfacing at our new build school in Kent. The installation team were polite and efficient and fitted a quality surface within our time frame.

Matt Lamberton BAM Construction

Another quality surface installed by Safeplay. They work with real energy and commitment.

Norman Perry Vertas